Oman Rail appointed a Consortium coordinated by FS International for reviewing the conceptual design of infrastructure and systems of the Mineral Line. The project consisted in a 212 km railway line, potentially interoperable with the GCC Railway, aimed at linking minerals sources located in the south of the Sultanate to Al Duqm Port and allowing connectivity also with the several Oil&Gas logistics centers of the country.

The contract duration was 6 months.